Srivatsa Foundations

SRI GUHAN ENCLAVE – PHASE I PDF Print E-mail

About project

A. Sri Guhan Enclave in a Nut Shell:

  1. Located at kundrathur
  2. Distances from site:
    1. Airport : 7 Km
    2. Porur : 9 Km
    3. Pallavaram : 5 Km
    4. Sriperambathur : 20 Km
    5. Poonamallee : 9 Km
  3. Phase I : 20 Flats in 5 plots : 871 to 1420 Sq. Ft. (Price Rs.34 L to 53 L)

B.Positive features:

  1. Well developed urban suburb
  2. Good and Broad roads with least signals
  3. Easy to reach DLF, L & T, Industrial belt of Sriperambathur & Oragadam, Mahindra SEZ, IT Corridor in OMR & GST Roads, Airport etc.
  4. Nearer to schools like PSBB Millennium, Omega International, Pon Vidyashramam etc.
  5. Well developed Markets for Grocery, fruits & Vegetables, Clothing and other daily needs
  6. Well connected bus services, Auto Stand, Private vans etc.
  7. Temples for mental solace & peace

Elevations

elevation1.jpg187.69 KBelevation2.jpg302.71 KB


Specification

SPECIFICATIONS FOR FLATS IN SRIVATSA'S "SRI GUHAN ENCLAVE " AT KUNDRATHUR, CHENNAI

1.
Basement:
Stilt car parking level will 1'-0" above adjacent road level.



2.
Height :
Between floor level and ceiling will be Min 9'-0" clear



3. Foundation&Super Structure (a) R.C.C. frame & R.C.C. footing.


(b) Non load bearing walls 8"/4"/3" of Hollow concrete blocks / Auto claved Brick blocks / Aerated concrete blocks as per our choice
4. Roof Treatment: Brick bats & lime concrete average 4" thickness and one layer of pressed tiles on top.



5. Flooring:
The entire flat will have vitrified tile flooring of first quality from reputed brands except below cooking platforms, wardrobes, cupboards and other storage spaces.



6. Electrical :
3 Phase power supply, good quality concealed multistrand wiring and piano type switches.





The no. of points provided will be as detailed below:

Living cum Dining: 2 Fan points, 3 Light points, 1 Call bell, 15 amp plug-1 no., T.V. point and 1 No. Telephone point.

Bed rooms: 2 Light points, 1-Fan point, 1-5 amps point for all bedrooms and 1 A.C. point & Computer point for master bedroom only.

Kitchen: 2 Light points, 1-Exhaust, 1-15 amp point, 1 no. 5 Amps point for Aquaguard.

Toilets: 2 Light points, 1 no. 5 amps point
1 Exhaust point, 1 Geyser point in one of the toilet.
Passages, entrance, service, rearsides will have 1 no. Light each. 1- no. 5 amp will be provided for Washing M/c.



7.
Plumbing:
Good quality PVC pipes for water supply, sewage & waste lines.


1 No. EWC, 1 No. Wash Basin & 1 No. Shower set per toilet


All taps and plumbing fittings of metro make or equivalent.



8.
Kitchen:
Black granite cooking platform and stainless steel sink. Ceramic tile / glazed tile skirting for 2'- 0" above cooking platform.



9.
Toilet:
Ceramic tile / glazed tile skirting for a ht. of 6'- 9"



10.
Other amenities:
(a) One loft in kitchen


(b) One cupboard in kitchen 3'-0" x 6'-6" high 1'-0" deep


(c)One wardrobe in each bedroom appx. 3'-0"/ 4'-0" x 6'-6" High x 1'-6" deep


(d) Loft and wardrobes will be open without shutters.






11.
Joinery:
(a)All doors & Window frames of C.W. 4" x 2½" (nominal size) for doors, Main doors and frames of Teakwood & 4" x 2" (nominal size) for windows and ventilators / UPVC or equivalent as per our choice.


(b)b) Window shutters will be glazed with good quality hard wood styles and with steel grills / UPVC or equivalent as per our choice.


(c)c) Entrance door will be with T.W. panelled shutters


(d) d) All other door shutters will be good quality flush doors with paint grade finish.



12.
Finishing:
(a)Interior walls -Smooth putty finish with suitable top coat (2 coats)


(b) b) 3 Coats of lime wash / lovlicem or equivalent for all ceilings, sunshades, lofts, cooking platforms etc.


(c) One coat of primer and 2 coats of enamel paint for all joinery and steel grills



13. General: (a) Common Sumps, Overhead tank, Septic tank


(b) b) Right of usage to one car parking slot approximately as indicated.

Location

LOCATION MAP

Site Layout

SITE LAYOUT

Floor plan

SRI GUHAN ENCLAVE – PHASE I

PLOT 1

1-first-flooor.jpg180.13 KB1-stilt-floor.jpg305.6 KB3-second-floor.jpg182.62 KB

PLOT 2 & 3

1a-stilt.jpg245.4 KB2&3-first&second.jpg210.65 KB2&3-terrace.jpg102.93 KB

PLOT 4

4-first-floor.jpg207.23 KB4-stilt-floor.jpg325.78 KB4-terrace.jpg166.84 KB

PLOT 5

5-STILT.jpg222.1 KB5-TERRACE.jpg37.66 KB5-first&second.jpg207.87 KB

Payment terms

Booking Advance

Rs.3 Lakhs.

Registration for UDS
35% of the price of the flat within 30 days
of allotment letter less booking advance
Foundation Stage 15% of the price of the flat
Stilt Floor / G. F. Roof slab

10% of the price of the flat

First Floor Roof Slab

10% of the price of the flat

Second Floor Roof Slab

10% of the price of the flat

Completion of Masonary for your flat

10% of the price of the flat

Plastering of your flat

5% of the price of the flat

Ready except final coat of painting, EB
connection

5% less Rs.10,000/-

Final Payment before possession

Rs.10,000/-


SRI GUHAN ENCLAVE - CONSTRUCTION PROGRESS STATUS AS ON 01.05.14
PLOT .NO FLAT NO STATUS STATUS
FOUNDATION GF ROOF FF ROOF SF ROOF MASONRY PLASTERING FLOORING
Plot 1 GF 1 C C C C N N N C - COMPLETED






P - ON PROGRESS






N - NOT IN COMMENCED

FF2 C C C C N N N

FF 3 C C C C N N N

SF 4 C C C C N N N
Plot 2 & 3 FF 1 C C C C P N N

FF2 C C C C C P N

FF 3 C C C C C C N

SF 4 C C C C C P N

SF 5 C C C C P N N

SF 6 C C C C P N N
Plot 4 GF 1 C C C C N N N

FF2 C C C C C C N

FF 3 C C C C N N N

SF 4 C C C C C C N
Plot 5 FF 1 C C C C C C N

FF2 C C C C C C N

FF 3 C C C C C P N

SF 4 C C C C P N N

SF 5 C C C C P N N

SF 6 C C C C P N N

Available Status

AVAILABILITY STATUS - SRI GUHAN ENCLAVE AS ON 01.06.2014
SL.NO PLOT NO FLAT NO SELLING
AERA
STATUS
1 1 1 1091 Available
2 1 2 1308 Sold
3 1 3 1106 Available
4 1 4 1317 Available
5 2&3 1 1319 Available
6 2&3 2 1359 Sold
7 2&3 3 1280 Sold
8 2&3 4 1319 Sold
9 2&3 5 1359 Available
10 2&3 6 1280 Available
11 4 1 1320 Available
12 4 2 1408 Sold
13 4 3 1378 Available
14 4 4 1412 Sold
15 5 1 1192 Sold
16 5 2 1188 Sold
17 5 3 871 Sold
18 5 4 1192 Available
19 5 5 1188 Available
20 5 6 871 Available

About site

SRI GUHAN ENCLAVE – PHASE I

INPUTS ABOUT SITE TO HELP IN YOUR DECISION MAKING

Names Location

Appx.
distance
from site

Transport Facilities
P. S. B. B. Millennium School Girugambakkam 6 Km Bus / Van
Pon Vidyashramam Kolapakkam 7 Km Bus
Omega International School Kolapakkam 6 Km Bus / Van

Padma Subramaniam Bala Bhavan
Matric School

Mangadu 4 Kms Bus
St. Francis International School Kolapakkam 8 Kms. Bus
Holy Cross Mat. School Kumaran Nagar, Gerugambakkam 7 Kms. Bus
Vijay Grade School Girugambakkam 2 Kms. ----
Nadar Sanga Mat. School Pammal 4 Kms. Van
CSI – Stephen's Mat. School Pallavaram 6 Kms. Van
Cantonment Board High School Pallavaram 6 Kms. Bus
St.Francies Xavier Nursery & Primary School Pallavaram 6 Kms. Bus
St.Sebastian's Mat. Higher Sec. School
6 Kms. Bus
St.Theresa Girls Higher Sec. School Pallavaram
Bus
Little Flower Matric Higher Secondary School
2 Kms Van
Madha Matric School
1 Km Bus

 
You are here  : Home Ongoing Projects